Doctor Apparels

Quality fabric abd quality stitching makes you feel comfortable and work like a pro

The 433-metre structure has a 126-metre central span that lifts to a height of 53 metres in just 11 minutes to allow ships to enter. The bridge showcases VINCI Construction’s wide-ranging expertise in foundations, mechanical engineering, marine works and civil engineering.

To connect the historic centre of Bordeaux on the left bank of the river with the business and residential neighbourhoods on the right bank without preventing cruise ships from reaching the Port de la Lune dock, the city opted to build a lift bridge.

  • Category

    Car Industry
  • Value

    $750,000,000
  • Client

    France Government
  • Architect

    Vinci Company
  • Location

    Bordeaux, France
  • Total length

    575 m (1,886 ft)
  • Material

    Concrete and Steel
  • Height

    77 m (253 ft)
  • Construction Start

    2009
  • Construction End

    2012
  • Opened

    March 2013